Canal Flats: IREN’s 30 MW Canadian campus, existing infrastructure and planned liquid-cooled AI expansion.
Northwise Research
Research and analysis
Latest research
Reports 73–96 of 200
Minnesota: Nebius documents Woodbury, while the Minneapolis property and 31 MW allocation in the earlier study remain unconfirmed.
A guide to Keel Infrastructure’s five development locations, including the construction start at Moses Lake, the Pennsylvania projects and Sherbrooke.
Cipher Digital's business model, three contracted HPC campuses, development pipeline and the delivery and financing questions behind CIFR.
IREN stock forecast 2030 through AI capacity, power, dilution, margins, contract durability, and long-term infrastructure risk.
Sweetwater: the two-site 2 GW development, energized substation, 300 MW construction phase and conditional Batch Zero status.
Keflavik: Nebius's Iceland service region, Verne's host campus and the limits of publicly disclosed tenant capacity.
Where will Jumia expand next after profitability? We examine Tanzania, Angola, and Ethiopia as post-2027 growth options.
Nebius ClickHouse is emerging as a strategic asset in the AI ecosystem. This report explores ClickHouse technology, growth, valuation, and Nebius’ stake.
Prince George: IREN’s 50 MW campus, the move from mining to GPUs and the next planned liquid-cooled deployment.
Kansas City: Nebius's Patmos deployment, current service-region evidence and the limits of older capacity and revenue assumptions.
Jumia Uganda: a growing revenue contribution from a smaller base, customer retention and the economics of expanding delivery coverage.
Childress: Microsoft’s acceptance of Horizon 1, the remaining phases and the difference between IT load and campus power.
Masmiyya: the reported 22 MW tenant agreement, Mega DC's separate project codes and the evidence needed to confirm delivery.
Jumia Kenya: current revenue growth, marketplace trust, delivery efficiency and the limits of country-level financial disclosure.
HOOD stock forecast 2030 analyzing Robinhood’s shift into tokenization, banking, and advisory to capture the generational wealth transfer.
Mackenzie: the 80 MW campus, financed air-cooled expansion and planned 2027 liquid-cooled deployment.
Beit Shemesh: the reported 58 MW IT tenant agreement, 240 MW host campus and differing phase schedules.
Jumia Algeria Exit Strategic Rationalization examines regulatory friction, tax reform, and structural barriers behind Algeria’s withdrawal.
A jumia stock forecast analyzing logistics economics, cash constraints, and 2030 price ranges across bear, base, and bull cases.
Modi'in: the documented Blackwell launch, host expansion and the distinction between Nebius equipment and Mega DC capacity.
Jumia Morocco: a mixed quarterly and first-half revenue comparison, local marketplace economics and corrected profitability terminology.
Nebius has 1.1 GW contracted at its Independence, Missouri data center. Follow the first building, the utility power plan and the 2027 deployment target.
Nebius Stock Forecast analyzing MW ramp, ARR per MW, capex intensity, and bear, base, bull valuation outcomes through 2030.
























