The map date is when this version was published. Source checks below cover only the sources attached to this version; they do not verify every site or constitute a company-wide editorial review.
IREN: 0 of 14 published sources checked successfully. No successful check recorded for this publication.
Nebius: 0 of 35 published sources checked successfully. No successful check recorded for this publication.
Keel: 0 of 5 published sources checked successfully. No successful check recorded for this publication.
CoreWeave: 0 of 32 published sources checked successfully. No successful check recorded for this publication.
CIFR: 0 of 8 published sources checked successfully. No successful check recorded for this publication.
WULF: 0 of 8 published sources checked successfully. No successful check recorded for this publication.
A separate company-wide editorial review date is not recorded. Each site retains its own source reporting dates.
101 locations · All regions
Map controls
Use Interact with map to drag or scroll to zoom. Finish interaction, or press Escape, to resume page scrolling.
Focus the map to pan with the arrow keys. Individual sites and clusters work without entering interaction mode.
Page scrolling enabled
101 of 101 matching locations in view
Choose a siteSearch or select a site from the list
IRENNebiusKeelCoreWeaveCIFRWULFSolid ring · town/cityDashed ring · approximate regionNumber = nearby locations · select to expand
Color identifies a single company; neutral clusters contain multiple companies. Numbers count nearby locations. A dashed amber ring includes an approximate regional reference. Ring styles describe location precision, not confirmation or operating status. Points are not facility addresses.
Announcements
All covered company updates
Includes site announcements and company-wide or regional outlook.
One entry per publication. Revisions compare like-for-like reports.
IREN · 08 Sept 2026
2 locations · 5 reported updates
Sweetwater 1 · 300 MW · Planned · Electrical power · Reported plan — Gross data-center capacity under construction within Sweetwater 1
Company or regional programme: Additional unnamed pipeline projects conditionally included in Batch Zero · Reported observation
Sweetwater 1 · Conditionally included in ERCOT Batch Zero as Base Load · Reported observation
All 5 reported updates
Sweetwater 1 · Construction continues on 300 MW gross data-center capacity · Reported observation
Sweetwater 2 · Conditionally included in ERCOT Batch Zero as Base Load · Reported observation
18 MW · Tenant allocation · Planned · Power basis unspecified · Reported plan — Nebius contracted lease allocation at MERLIN Edged; gross/IT basis not stated in the post
18 MW · Tenant allocation · Planned · Power basis unspecified · Reported plan — Nebius contracted lease allocation at MERLIN Edged; gross/IT basis not stated in the post
Company or regional programme: 40 MW · Active · Power basis unspecified · Reported observation — Company-wide operating AI Cloud Services capacity; electrical/IT basis not explicitly assigned
Badajoz · 300 MW · Gross planned · Electrical power · Reported plan — Planned gross power
Bundey · 800 MW · Gross planned · Electrical power · Reported plan — Planned gross power
All 26 reported updates
Canal Flats · 30 MW · Gross planned · Electrical power · Reported plan — Planned gross power
Childress · 750 MW · Gross planned · Electrical power · Reported plan — Planned gross power
Kiowa · 1,600 MW · Gross planned · Electrical power · Reported plan — Planned gross power
Mackenzie · 80 MW · Gross planned · Electrical power · Reported plan — Planned gross power
Prince George · 50 MW · Gross planned · Electrical power · Reported plan — Planned gross power
Sweetwater 1 · 1,400 MW · Gross planned · Electrical power · Reported plan — Planned gross power
Sweetwater 2 · 600 MW · Gross planned · Electrical power · Reported plan — Planned gross power
Company or regional programme: Company-wide power agreements cover approximately 5 GW of electrical capacity · Reported observation
Company or regional programme: 40 MW · Active · Power basis unspecified · Reported observation — Company-wide operating AI Cloud Services capacity; electrical/IT basis not explicitly assigned
Company or regional programme: 1,500 MW · Active · Power basis unspecified · Reported observation — Company-wide reported active power
Company or regional programme: 3,700 MW · State unspecified · Power basis unspecified · Reported observation — Company-wide approximately contracted power
Company or regional programme: 3,700 MW · State unspecified · Power basis unspecified · Reported observation — Company-wide approximately contracted power
Company or regional programme: 102 MW · Active · IT power · Reported observation — Company-wide July 2026 reported revenue-generating critical IT capacity
Company or regional programme: 839 MW · State unspecified · IT power · Reported observation — Company-wide contracted critical IT capacity
CB-1: 16 MW · Delivered · IT power · Reported observation — Delivered phase critical IT capacity
All 16 reported updates
Lake Mariner · CB-2A: 21 MW · Delivered · IT power · Reported observation — Delivered phase critical IT capacity
Lake Mariner · CB-2B: 21 MW · Delivered · IT power · Reported observation — Delivered phase critical IT capacity
Lake Mariner · CB-3: 42 MW · Delivered · IT power · Reported observation — Delivered phase critical IT capacity
Lake Mariner · CB-4: 168 MW · Planned · IT power · Reported plan — Contracted phase critical IT under construction
Lake Mariner · CB-5: 168 MW · Planned · IT power · Reported plan — Contracted phase critical IT under construction
Lake Mariner · WULF Den: 2 MW · Delivered · IT power · Reported observation — Delivered phase critical IT capacity
Lake Mariner · CB-1: Phase identified: CB-1
Lake Mariner · CB-2A: Phase identified: CB-2A
Lake Mariner · CB-2B: Phase identified: CB-2B
Lake Mariner · CB-3: Phase identified: CB-3
Lake Mariner · CB-4: Phase identified: CB-4
Lake Mariner · CB-5: Phase identified: CB-5
Lake Mariner · WULF Den: Phase identified: WULF Den
Company or regional programme: 102 MW · Active · IT power · Reported observation — Company-wide July 2026 reported revenue-generating critical IT capacity
Muskie / EastPark · Initial power-service phase: 500 MW · Planned · Electrical power · Reported plan — Initial phase contracted electrical service
Company or regional programme: Entire Abernathy equity interest divested · 2026-07-06 · Reported observation
Lake Hawkeye / Cayuga · Company flags potential New York permitting-framework risk for Cayuga development while stating no current expectation of a material effect from the temporary pause on its development timeline. · Reported observation
Company flags potential New York permitting-framework risk for Cayuga development while stating no current expectation of a material effect from the temporary pause on its development timeline. · Reported observation
Company or regional programme: 490 MW · State unspecified · Electrical power · Reported observation — Acquired Nostrum portfolio secured grid-connected power; not commissioned IT
Company or regional programme: 490 MW · State unspecified · Electrical power · Reported observation — Acquired Nostrum portfolio secured grid-connected power; not commissioned IT
1,200 MW · Expansion ceiling · Power basis unspecified · Expansion ceiling — Secured power and land for a planned deployment up to 1.2 GW; gross/IT basis unspecified
1,200 MW · Expansion ceiling · Power basis unspecified · Expansion ceiling — Secured power and land for a planned deployment up to 1.2 GW; gross/IT basis unspecified
Company or regional programme: 648 MW · State unspecified · Electrical power · Reported observation — Company secured gross data center power; energized and contracted supply
Company or regional programme: 648 MW · State unspecified · Electrical power · Reported observation — Company secured gross data center power; energized and contracted supply
15 MW · Host campus · State unspecified · IT power · Reported observation — MERLIN Edged Barcelona host asset IT capacity; CoreWeave allocation undisclosed
15 MW · Host campus · State unspecified · IT power · Reported observation — MERLIN Edged Barcelona host asset IT capacity; CoreWeave allocation undisclosed
Apollo · 900 MW · Gross planned · Electrical power · Reported plan — Company-listed gross pipeline capacity
Barber Lake · 300 MW · Connected · Electrical power · Reported observation — Contracted gross electrical footprint, reported energized
Barber Lake · Adjacent expansion: 500 MW · Gross planned · Electrical power · Reported plan — Adjacent gross grid expansion within the same campus family
All 15 reported updates
Black Pearl · 300 MW · Connected · Electrical power · Reported observation — Contracted gross electrical footprint, reported energized
Colchis · 1,000 MW · Gross planned · Electrical power · Reported plan — Company-listed gross pipeline capacity
McLennan · 500 MW · Gross planned · Electrical power · Reported plan — Company-listed gross pipeline capacity
Mikeska · 500 MW · Gross planned · Electrical power · Reported plan — Company-listed gross pipeline capacity
Milsing · 500 MW · Gross planned · Electrical power · Reported plan — Company-listed gross pipeline capacity
Company or regional programme: 4,200 MW · State unspecified · Power basis unspecified · Reported observation — Company-wide contracted power lower bound
Company or regional programme: 4,200 MW · State unspecified · Power basis unspecified · Reported observation — Company-wide contracted power lower bound
30 MW · Connected · Electrical power · Reported observation — Company-reported campus power capacity with direct grid connection; not active GPU IT load
30 MW · Connected · Electrical power · Reported observation — Company-reported campus power capacity with direct grid connection; not active GPU IT load
750 MW · Connected · Electrical power · Reported observation — Company-reported campus power capacity with direct grid connection; not active GPU IT load
750 MW · Connected · Electrical power · Reported observation — Company-reported campus power capacity with direct grid connection; not active GPU IT load
80 MW · Connected · Electrical power · Reported observation — Company-reported campus power capacity with direct grid connection; not active GPU IT load
80 MW · Connected · Electrical power · Reported observation — Company-reported campus power capacity with direct grid connection; not active GPU IT load
50 MW · Connected · Electrical power · Reported observation — Company-reported campus power capacity with direct grid connection; not active GPU IT load
50 MW · Connected · Electrical power · Reported observation — Company-reported campus power capacity with direct grid connection; not active GPU IT load
Beit Shemesh · 58 MW · Tenant allocation · Planned · IT power · Reported plan — Nebius contracted IT allocation; distinct from the wider Beit Shemesh campus
Masmiya / Masmiyya · 22 MW · Tenant allocation · Planned · IT power · Reported plan — Nebius contracted IT allocation; distinct from the wider Masmiya campus
Beit Shemesh · 58 MW · Host campus · Planned · IT power · Reported plan — Beit Shemesh host Phase A planned IT capacity and construction-completion target; host phase; it power
Beit Shemesh · 60 MW · Host campus · Planned · IT power · Reported plan — Beit Shemesh host Phase B planned IT capacity; host phase; it power
Beit Shemesh · 80 MW · Host campus · Planned · IT power · Reported plan — Beit Shemesh host Phase C future IT capacity; host phase; it power
All 5 reported updates
Masmiya / Masmiyya · 42 MW · Host campus · Planned · IT power · Reported plan — Masmiyya / Yoav Lot 200A host phase planned IT capacity and construction-completion target; host phase; it power
Modiin · 9 MW · Host campus · Planned · IT power · Reported plan — Modiin host Phase B planned IT capacity and construction-completion target; host phase; it power
58 MW · Host campus · Planned · IT power · Reported plan — Beit Shemesh host Phase A planned IT capacity and construction-completion target; host phase; it power
42 MW · Host campus · Planned · IT power · Reported plan — Masmiyya / Yoav Lot 200A host phase planned IT capacity and construction-completion target; host phase; it power
9 MW · Host campus · Planned · IT power · Reported plan — Modiin host Phase B planned IT capacity and construction-completion target; host phase; it power
Beit Shemesh · 240 MW · Host campus · Planned · Power basis unspecified · Reported plan — Mega DC host-campus total power; not Nebius’s allocated capacity; electrical/IT basis unspecified
Masmiya / Masmiyya · 40 MW · Host campus · Planned · Power basis unspecified · Reported plan — Mega DC host-campus total power; not Nebius’s allocated capacity; electrical/IT basis unspecified
Modiin · 20 MW · Host campus · State unspecified · Power basis unspecified · Reported observation — Mega DC host-campus total power; not Nebius’s allocated capacity; electrical/IT basis unspecified
240 MW · Host campus · Planned · Power basis unspecified · Reported plan — Mega DC host-campus total power; not Nebius’s allocated capacity; electrical/IT basis unspecified
40 MW · Host campus · Planned · Power basis unspecified · Reported plan — Mega DC host-campus total power; not Nebius’s allocated capacity; electrical/IT basis unspecified
20 MW · Host campus · State unspecified · Power basis unspecified · Reported observation — Mega DC host-campus total power; not Nebius’s allocated capacity; electrical/IT basis unspecified
These additional pipeline projects remain unnamed, with no locations, count or MW disclosed. IREN plans to add them to its announced portfolio after grid connection agreements are signed; ongoing approvals still apply.
Publication date: As of 2026-09-08 (day precision; time and zone unspecified)
Reporting date: As of 2026-09-08 (day precision; time and zone unspecified)
IREN · Reported
Company-wide power agreements cover approximately 5 GW of electrical capacity
Executed grid connection agreements, letters or equivalent agreements cover approximately 5 GW across the company’s markets. Secured commercial power rights are not achieved grid energization, delivered AI facilities or active IT load. The approximate value is not a sum calculated by Northwise.
Publication date: As of 2026-08-27 (day precision; time and zone unspecified)
Reporting date: As of 2026-06-30 (day precision; time and zone unspecified)
IREN · Active
40 MW
Company-wide operating AI Cloud Services capacity; electrical/IT basis not explicitly assigned
Dated company deck snapshot, not a calculated campus sum. Contracted, operating, construction and pipeline categories overlap. Pending acquisitions do not establish completed ownership, and figures from different reporting dates must remain separate.
Publication date: As of 2026-08-05 (day precision; time and zone unspecified)
Reporting date: As of Q3 2026 (calendar year; quarter precision)
WULF · Capacity — state unspecified · IT power · Reported
Dated company deck snapshot, not a calculated campus sum. Contracted, operating, construction and pipeline categories overlap. Pending acquisitions do not establish completed ownership, and figures from different reporting dates must remain separate.
Publication date: As of 2026-08-05 (day precision; time and zone unspecified)
Reporting date: As of 2026-08-05 (day precision; time and zone unspecified)
The company sold its entire 50.1% stake and retained no equity. Deferred cash installments are receivables, not retained capacity; exclude Abernathy from current WULF pins.
Publication date: As of 2026-08-05 (day precision; time and zone unspecified)
Reporting date: As of 2026-07-06 (day precision; time and zone unspecified)
CIFR · Capacity — state unspecified · Electrical power · Reported
Three executed HPC leases: original Barber Lake 300, Black Pearl 300 and Stingray 100 gross MW. Contracted does not mean all delivered, energized or active. Adjacent expansions are outside this contracted total.
Publication date: As of 2026-08-04 (day precision; time and zone unspecified)
Reporting date: As of 2026-08-04 (day precision; time and zone unspecified)
IREN · Capacity — state unspecified · Electrical power · Reported
490 MW
Acquired Nostrum portfolio secured grid-connected power; not commissioned IT
Historical company statement published May 13, 2026. The company reports a lower threshold, not an exact 3.5 GW value or September operating capacity. Contracted capacity does not establish active or connected power, and an IT basis is not assigned.
Publication date: As of 2026-05-13 (day precision; time and zone unspecified)
Reporting date: As of 2026-05-13 (day precision; time and zone unspecified)
Keel · Capacity — state unspecified · Electrical power · Reported
648 MW
Company secured gross data center power; energized and contracted supply
Filed March 27 baseline: 341 MW energized plus 430 MW secured growth, less 123 MW without ESAs. Not active HPC capacity. Existing Sherbrooke 96 MW is counted once; the future relocation adds no power.
Publication date: As of 2026-03-31 (day precision; time and zone unspecified)
Reporting date: As of 2026-03-27 (day precision; time and zone unspecified)
Nebius · Active · IT power
170 MW
Company-wide active power consumed by IT equipment
Approximately 170 MW of active power was reported as of December 31, 2025, with active defined as power being consumed by IT equipment. This dated historical company total is not a September 2026 measurement. Preserve the approximation when displaying the value; no site allocation or aggregate calculated from map rows.
Publication date: As of 2026-02-12 (day precision; time and zone unspecified)
Reporting date: As of 2025-12-31 (day precision; time and zone unspecified)
Alborz, Bear and Chief Mountain are former interests, not current Cipher campus pins. Canaan’s acquisition of Black Pearl mining rigs did not transfer the Black Pearl campus.
Publication date: Date and meaning unknown
Reporting date: As of 2026-06-30 (day precision; time and zone unspecified)
One country programme reference for three unlocated facilities. Jakarta dateline is not a disclosed site location; no fictional three-city pins. Source date and current operating state are distinct; no building-to-AZ assignment or tenant MW is inferred.
Publication date: As of 2026-08-04 (day precision; time and zone unspecified)
Reporting date: As of 2026-08-04 (day precision; time and zone unspecified)
Indonesia — three-facility programme · Planned · IT power
360 MW
Contracted IT programme across three unlocated facilities
Company-announced second Stockholm campus; name, street and initial delivery are undisclosed. The named Stockholm 4 South campus is not counted twice. Source date and current operating state are distinct; no building-to-AZ assignment or tenant MW is inferred.
Publication date: As of 2026-06-24 (day precision; time and zone unspecified)
Reporting date: As of 2026-06-24 (day precision; time and zone unspecified)