Sworn Texas testimony and county land records reveal two potential IREN data center sites near Sweetwater. See the land maps, route dispute and power outlook.
Northwise Research
IREN research
12 published reports
Northwise proposes nine AI infrastructure categories, comparing Nebius, CoreWeave, IREN, GPU renters and hosts by software, financing and commoditization risk.
IREN stock analysis of AI growth, funding and dilution through 2030. Read our full valuation, 27 scenarios and price zones free. Excel model is Premium.
IREN’s new AI-developer contracts are the strongest evidence yet that it can sell something more valuable than bulk hyperscaler capacity.
Follow IREN’s campuses from Childress and Sweetwater to British Columbia, Australia and Spain, with site studies and the November construction update.
Kiowa, Oklahoma: IREN’s 1.6 GW planned power position, development timing and the remaining delivery dependencies.
Canal Flats: IREN’s 30 MW Canadian campus, existing infrastructure and planned liquid-cooled AI expansion.
IREN stock forecast 2030 through AI capacity, power, dilution, margins, contract durability, and long-term infrastructure risk.
Sweetwater: the two-site 2 GW development, energized substation, 300 MW construction phase and conditional Batch Zero status.
Prince George: IREN’s 50 MW campus, the move from mining to GPUs and the next planned liquid-cooled deployment.
Childress: Microsoft’s acceptance of Horizon 1, the remaining phases and the difference between IT load and campus power.
Mackenzie: the 80 MW campus, financed air-cooled expansion and planned 2027 liquid-cooled deployment.