IREN Stock Dilution: Can the Build Reach Shareholders?
IREN stock analysis of AI growth, funding and dilution through 2030. Read our full valuation, 27 scenarios and price zones free. Excel model is Premium.
Northwise Research
IREN stock analysis of AI growth, funding and dilution through 2030. Read our full valuation, 27 scenarios and price zones free. Excel model is Premium.
IREN’s new AI-developer contracts are the strongest evidence yet that it can sell something more valuable than bulk hyperscaler capacity.
Explore IREN data centers in Canada, the US, Australia and Spain, with site studies and clear distinctions between planned power and delivered AI capacity.
Kiowa, Oklahoma: IREN’s 1.6 GW planned power position, development timing and the remaining delivery dependencies.
Canal Flats: IREN’s 30 MW Canadian campus, existing infrastructure and planned liquid-cooled AI expansion.
IREN stock forecast 2030 through AI capacity, power, dilution, margins, contract durability, and long-term infrastructure risk.
Sweetwater: the two-site 2 GW development, energized substation, 300 MW construction phase and conditional Batch Zero status.
Prince George: IREN’s 50 MW campus, the move from mining to GPUs and the next planned liquid-cooled deployment.
Childress: Microsoft’s acceptance of Horizon 1, the remaining phases and the difference between IT load and campus power.
Mackenzie: the 80 MW campus, financed air-cooled expansion and planned 2027 liquid-cooled deployment.